Savings potential

How much of your expert time goes into what you already know?

Move the sliders to match your situation. The calculation instantly shows what assessing your specifications costs today and what reuse would mean.

Your business

Sets suitable starting values. You can adjust every value afterwards.

Your assessment today

A rough estimate is enough.

How many requests with customer requirements does your team assess?
All departments combined, per request
Full cost including overheads
Costs from requirements overlooked in the bid
How much of a new specification do you already know at its core – a quarter, half, more? Today this part is usually assessed again anyway.

Additionally: requests you decline today

Optional. Shown separately.


How much effort could be eliminated?

Your assumption, not a measurement. The range in the result runs from cautious to ambitious.

For your colleagues

How the calculator works

Three building blocks, each a simple multiplication. The calculation runs entirely in your browser.

1. Calculation with your current values

Updates live as you move a slider.

2. The formulas

Expert time = A × h × s × ( b × u + (1 − b) × n )Effort today (A × h × s): for the known share b, the portion u is eliminated; for the new share (1 − b), the portion n.
Rework = K × vCosts from overlooked requirements, of which the avoidable share v.
Recovered orders = N × g × D × rOptional and always shown separately, never in the main total.
Potential = Expert time + ReworkRange = result with “Cautious” to “Ambitious”. Full-time equivalents = hours saved ÷ 1,650 h. Cost per month of waiting = potential ÷ 12. Person-days = h ÷ 8.

3. Inputs

SymbolMeaningStart: Components / Systems / Large projects
ARequests or specifications per year1,500 / 200 / 60
hAssessment hours per request6 / 40 / 400
sInternal hourly rate (€)95 / 95 / 110
bShare known from previous projects40%
KRework, change orders, penalties per year (€)500k / 800k / 5M
NRequests per year declined or too late100 / 20 / 5
gWin rate20 / 25 / 25%
DContribution margin per order (€)50k / 300k / 3M

4. Assumptions (presets)

SymbolMeaningCautious / Medium / Ambitious
uEffort eliminated on known content (reuse)50 / 70 / 85%
nEffort eliminated on new content (pre-assessment, assignment)5 / 15 / 25%
vAvoidable share of rework10 / 20 / 30%
rDeclined requests handled in future25 / 50 / 75%

With 40% known content, “Medium” gives a 37% time saving.